Sign In  |  Register  |  About Burlingame  |  Contact Us

Burlingame, CA
September 01, 2020 10:18am
7-Day Forecast | Traffic
  • Search Hotels in Burlingame

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

Stillwater Critical Minerals Appoints Glencore’s Bradley Adamson to its Board of Directors

VANCOUVER, BC / ACCESSWIRE / June 3, 2024 / Stillwater Critical Minerals Corp. (TSX.V:PGE)(OTCQB:PGEZF)(FSE:J0G) (the "Company" or "Stillwater") is pleased to announce the appointment of Mr. Bradley Adamson as an Independent Director.

Mr. Adamson is a veteran resource industry professional with over 25 years of global experience focused on nickel and cobalt in Canada, Africa, Brazil and Australia with Glencore PLC, where he leads Business Development for Glencore's nickel group. He has led and been involved with many of Glencore's nickel divestments, mergers and acquisitions and has held various board positions for the group.

He holds a Bachelor of Engineering in Minerals Engineering from the Western Australian School of Mines along with a Post Graduate Diploma in Applied Finance from Kaplan Professional. He began his career with WMC Resources followed with periods at Anaconda Operations and BHP Billiton. He joined Glencore in 2004 and has developed a strong operational, project development and commercial background over the subsequent 20 years with the group.

Stillwater Critical Minerals President & CEO, Michael Rowley commented, "We are very pleased to announce the appointment of Bradley Adamson as Glencore's appointee to the Stillwater board of directors. Bradley brings extensive corporate experience in global mining and mine finance in addition to his strong background in nickel and cobalt metallurgy to our work in the Stillwater Igneous Complex, one of the world's most iconic magmatic formations. We look forward to providing further updates including additional drill results as we continue to advance our flagship Stillwater West critical minerals project towards its potential as a primary US-based source of battery and catalytic metals."

Warrant Extension

The Company further reports that it has applied for TSX Venture Exchange approval to extend the expiry date on certain warrants that are due to expire June 16, 2024 (the "Warrants"). Per the application, 7,406,250 Warrants that were originally issued as part of a financing completed in June 2021 (see news release June 16, 2021) will be extended to a new expiration date of June 16, 2025. Each Warrant entitles the holder to acquire one common share at an exercise price of CDN$ 0.55.

About Stillwater Critical Minerals Corp.

Stillwater Critical Minerals (TSX.V:PGE)(OTCQB:PGEZF)(FSE:J0G) is a mineral exploration company focused on its flagship Stillwater West Ni-PGE-Cu-Co + Au project in the iconic and famously productive Stillwater mining district in Montana, USA. With the addition of two renowned Bushveld and Platreef geologists to the team and strategic investments by Glencore, the Company is well positioned to advance the next phase of large-scale critical mineral supply from this world-class American district, building on past production of nickel, copper, and chromium, and the on-going production of platinum group, nickel, and other metals by neighboring Sibanye-Stillwater. An expanded NI 43-101 mineral resource estimate, released January 2023, positions Stillwater West with the largest nickel resource in an active US mining district as part of a compelling suite of nine minerals now listed as critical in the USA. To date, five Platreef-style nickel and copper sulphide deposits host a total of 1.6 billion pounds of nickel, copper and cobalt, and 3.8 million ounces of palladium, platinum, rhodium, and gold at Stillwater West. All deposits remain open for expansion along trend and at depth. Results are pending from resource expansion drilling completed in the fall of 2023.

Stillwater also holds the high-grade Black Lake-Drayton Gold project adjacent to Treasury Metals' development-stage Goliath Gold Complex in northwest Ontario, currently under an earn-in agreement with Heritage Mining, and the Kluane PGE-Ni-Cu-Co critical minerals project on trend with Nickel Creek Platinum‘s Wellgreen deposit in Canada‘s Yukon Territory.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Michael Rowley, President, CEO & Director - Stillwater Critical Minerals
Email: info@criticalminerals.com
Phone: (604) 357 4790
Web: http://criticalminerals.com
Toll Free: (888) 432 0075

Forward-Looking Statements

This news release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts including, without limitation, statements regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although Stillwater Critical Minerals believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions. Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain necessary approvals, unsuccessful exploration results, changes in project parameters as plans continue to be refined, results of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. For more information on Stillwater Critical Minerals and the risks and challenges of their businesses, investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE: Stillwater Critical Minerals



View the original press release on accesswire.com

Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Copyright © 2010-2020 Burlingame.com & California Media Partners, LLC. All rights reserved.