Sign In  |  Register  |  About Burlingame  |  Contact Us

Burlingame, CA
September 01, 2020 10:18am
7-Day Forecast | Traffic
  • Search Hotels in Burlingame

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

UK Silt Pumping Company Clearing Kent’s Lakes Waterways & Land Services

Boyden Environmental (07546-448111) Silt Pumping, Lake desilting and Land Clearing services can be requested through their website.

Canterbury,United Kingdom - October 23, 2022 /PressCable/

Silt Pumping and Silt Removal is needed when the breakdown of dead organic matter and field run-off begins to settle at the base of a lake, river or pond, this silt can soon have serious repercussions on the water and organisms living within it.

The build up of silt eventually reduces the depth of your watercourse, not only killing off fish and diverse creatures that depend on it but also increasing the risk of flooding in severe weather conditions. Silt in lakes and ponds also impacts their use as a leisure facility, as the organic matter begins to decompose, releasing nasty odours and attracting unwanted insects.

Silt removal, or “desilting”, represents a specialised and potentially costly activity. Fortunately, at Boyden Environmental they make it affordable to carry out this challenging task whether you’re a domestic or commercial customer.

For further information contact Boyden Environmental

Thanks to their cutting edge equipment, they offer effective Silt Pumping, lake dredging, silt removal and desilting services at competitive prices.

Their powerful pump utilises a rotating mechanical mill that can lower directly into the silt matter, agitating the sediment and pumping it through flexible pipes to land.

The purpose-designed pump carries out lake desilting by as much as 5000 litres per minute, at a depth of 2.2 metres. The speed and volume of desilting that is made possible by our silt pump makes this a popular option for lake desilting.

Dewatering bags are an option that works well when pumping to remove silt. Placed on a flat surface to prevent movement, the silt is pumped directly into the permeable de-watering bags and left to drain. The bags can then be opened and the silt used for landscaping.

De-silting to create a bank is accomplished by installing a permeable membrane around the edge of the existing bank and depositing silt behind it. As the water seeps through the membrane and the silt remains, a bank is formed that can be filled with plants to create an attractive border.

Silt stockpiling is another great option when dredging a lake or pond. By creating a temporary bund, silt can be deposited and left to drain, allowing it to be removed from the bund when dried

As well as offering reliable, transparent and flexible Silt Pumping and Silt Removal services, their competitive pricing makes Boyden Environmental an ideal choice for domestic and commercial clients. For an efficient and affordable solution to all your lake and pond cleaning needs, speak to a member of their team today, by visiting their website.

A spokesman for the company said “with the extremely hot summer had this year there was increased build up of organic matter in all different kinds of waterways which release bad odours aswell as toxic waters for any wildlife.’

Contact Info:
Name: Charlie Miller
Email: Send Email
Organization: Boyden Environmental
Address: Boyden Gate Farm House, Chislet, Canterbury, Kent CT3 4EB, United Kingdom
Phone: +44-7546-448111
Website: https://www.boydenenvironmental.com

Source: PressCable

Release ID: 89083651

If you detect any issues, problems, or errors in this press release content, kindly contact error@releasecontact.com to notify us. We will respond and rectify the situation in the next 8 hours.

Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Copyright © 2010-2020 Burlingame.com & California Media Partners, LLC. All rights reserved.