Form 6-K
 
 
SECURITIES AND EXCHANGE COMMISSION
Washington, DC 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16 OF
THE SECURITIES EXCHANGE ACT OF 1934
From: June 7, 2010
IVANHOE MINES LTD.
 
(Translation of Registrant’s Name into English)
Suite 654 — 999 CANADA PLACE, VANCOUVER, BRITISH COLUMBIA V6C 3E1
 
(Address of Principal Executive Offices)
(Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.)
Form 20-F- o Form 40-F- þ
(Indicate by check mark whether the registrant by furnishing the information contained in this form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.)
Yes: o No: þ
(If “Yes” is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b): 82-                    .)
Enclosed:
News Release
 
 

 

 


 

(LOGO)
June 7, 2010
Phase-one drilling program improves grades and extent of high-grade
gold mineralization at Ivanhoe Mines’ 50%-owned Kyzyl Gold Project
in northeastern Kazakhstan
Results to be used in updated, independent resource estimate
and pre-feasibility study
ALMATY, KAZAKHSTAN — Robert Friedland, Chairman of Ivanhoe Mines, and David Woodall, Chief Executive Officer of Altynalmas Gold Ltd., announced today that gold mineralization has been expanded and upgraded by confirmatory drilling at Altynalmas’s Kyzyl Gold Projectin northeastern Kazakhstan. Ivanhoe Mines owns 50% of Altynalmas.
Long intercepts of high-grade gold mineralization, including 38 metres of 17.13 grams of gold per tonne (g/t) in hole BAK-23-2010, 43 metres of 11.18 g/t gold in hole BAK-14-2009 and 22 metres of 10.31 g/t gold in hole BAK-27-2010, are among the results from 57 exploration holes, totalling 27,346 metres, that were drilled as part of a phase one program between October 2009 and April 2010.
“We have been able to significantly improve drill-core recovery from the gold zones to more than 90% using the wireline and triple-tube method in the current drilling program,” Mr. Woodall said. “This is much better than the core recovery of approximately 75% that was managed by drilling during Soviet-era development on the Kyzyl deposits.
“Our latest drilling yielded improved grades and widths of gold intercepts over Soviet-era discoveries, while also confirming the proven quality of the Kyzyl resource.”
Mr. Woodall said the key value drivers of the Kyzyl Gold Project are grade and metallurgical recoveries.
“We expected significant gold intercepts and are very pleased with the results produced so far by the current drilling program. We’re confident that the pre-feasibility study resource model will be improved when these new drilling results are incorporated. The drilling results and the metallurgical test-work programs, achieving gold recoveries of between 86% and 90% using fluidized-bed roasting, indicate the robustness and quality of the project.”
Mr. Woodall said the drilling results will be used in a pre-feasibility study being prepared by Scott Wilson Roscoe Postle and Associates (Scott Wilson RPA), of Toronto, Canada. The study, set for completion within the next month, is expected to upgrade a large percentage of the Kyzyl Gold Project’s Resources into Mineral Reserves.
The assay results of 29 holes drilled into the middle zone of Lens 1 of the Bakyrchik Deposit are listed below (and also are shown on illustrations on Ivanhoe’s website at www.ivanhoemines.com). Intersection widths and grade tenor correlate well with the results of the earlier, Soviet-era drilling results. All the holes intercepted significant widths of high-grade gold mineralization, with many of the holes having some intercepts grading close to one ounce of gold per ton (34.3 grams per tonne).

 

 


 

Bakyrchik Deposit drill results — Lens 1, May 31 2010
                                         
            From     To     Interval     Gold Grade  
Hole-ID   Section     (m)     (m)     (m)     (g/t)  
BAK-01-2009
    435300       282       296       14       10.31  
inc
            291       294       3       22.20  
BAK-02-2009
    435300       315       326       11       14.76  
inc
            322       325       3       28.28  
BAK-03-2009
    435300       331       348       17       7.06  
BAK-04-2009
    435325       407       411       4       22.43  
and
            417       438       21       10.53  
inc
            427       430       3       23.23  
BAK-05-2009
    435350       309       334       25       9.14  
inc
            315       318       3       18.57  
inc
            324       327       3       19.47  
and
            340       343       3       3.34  
BAK-07-2009
    435300       428       455       27       11.15  
inc
            432       435       3       20.51  
inc
            439       442       3       20.23  
BAK-08-2009
    435350       369       381       12       11.33  
inc
            374       378       4       23.16  
and
            387       411       24       10.10  
BAK-09-2009
    435425       330       344       14       10.22  
inc
            338       341       3       28.92  
and
            349       355       6       4.30  
and
            396       410       14       6.34  
BAK-10-2009
    435350       424       434       10       9.32  
inc
            425       428       3       17.45  
and
            452       471       19       12.09  
inc
            455       462       7       19.90  
BAK-11-2009
    435450       337       353       16       6.86  
BAK-12-2009
    435450       379       398       19       9.29  
inc
            383       386       3       16.53  
BAK-13-2009
    435275       413       441       28       10.67  
inc
            436       439       3       16.35  

 

 


 

                                         
            From     To     Interval     Gold Grade  
Hole-ID   Section     (m)     (m)     (m)     (g/t)  
BAK-14-2009
    435300       378       421       43       11.18  
inc
            380       385       5       18.35  
inc
            396       400       4       17.01  
inc
            408       411       3       19.60  
BAK-15-2009
    435225       379       388       9       10.46  
BAK-16-2009
    435225       426       443       17       14.92  
BAK-17-2009
    435425       295       307       12       19.77  
and
            335       346       11       4.83  
BAK-18-2009
    435200       426       433       7       12.65  
inc
            429       432       3       20.48  
BAK-19-2009
    435225       354       360       6       12.82  
 
            355       358       3       21.28  
BAK-20-2009
    435425       270       289       19       6.76  
inc
            270       273       3       20.10  
and
            320       329       9       7.15  
BAK-21-2009
    435450       462       491       29       7.06  
BAK-22-2009
    435325       306       324       18       9.85  
inc
            321       324       3       20.97  
BAK-23-2010
    435300       480       518       38       17.13  
inc
            485       500       15       24.10  
inc
            509       516       7       18.51  
BAK-24-2009
    435300       254       258       4       7.83  
BAK-25-2010
    435325       268       285       17       10.00  
inc
            281       284       3       16.47  
BAK-27-2010
    435375       353       375       22       10.31  
inc
            354       358       4       18.88  
inc
            366       369       3       19.60  
and
            392       398       6       9.30  
BAK-28-2010
    435450       497       516       19       5.98  
and
            525       534       9       12.04  
inc
            526       530       4       18.74  
BAK-30-2010
    435450       287       290       3       6.52  
BAK-31-2010
    435200       450       459       9       10.49  
BAK-33-2010
    435350       294       319       25       9.70  

 

 


 

Notes:
1.   Intersection assays are a composite of one-metre assays calculated from interval-weighted assays over the intersection length using a 2.0 g/t gold cut-off.
 
2.   The included intervals are significantly higher in tenor and exceed 15.0 g/t gold within the 2.0 g/t gold cut-off intervals.
 
3.   No high assay values have been cut.
 
4.   Holes BAK-06-2009, BAK-26-2010, BAK-29-2010 and BAK-32-2010 are awaiting completion of assaying.
 
5.   Interval widths are generally equivalent to true widths.
Quality Assurance and Quality Control
Exploration core was drilled HQ size (63.5-mm diameter) using western drill strings and triple-tube HQ3 core (61.1-mm diameter) was used for geotechnical logging within, and on the shoulders, of the mineralized zone. Assaying of the samples was completed at ALS Chemex, an independent ISO-credited laboratory in Vancouver, Canada, using fire assay fusion followed by a gravimetric analysis procedure.
Quality assurance and quality control is independently monitored and audited by Scott Wilson RPA with a quality-control program, which includes the use of matrix matched assay standard reference samples, blanks, duplicates, repeats and internal ALS Chemex quality-assurance procedures.
Qualified Person
Disclosures of a scientific or technical nature in this release have been reviewed by David Woodall, Chief Executive Officer of Altynalmas Gold Ltd. and a Qualified Person as defined by National Instrument 43-101.
About Ivanhoe Mines
Ivanhoe Mines (NYSE, NASDAQ & TSX: IVN) is an international mining company with operations focused in the Asia Pacific region. Assets include the company’s 66% interest in the Oyu Tolgoi copper-gold mine development project in southern Mongolia; its 57% interest in Mongolian coal miner SouthGobi Resources (TSX: SGQ; HK: 1878); an 81% interest in Ivanhoe Australia (ASX: IVA), a copper-gold-uranium-molybdenum-rhenium exploration and development company; and a 50% interest in Altynalmas Gold Ltd., a private company developing the Kyzyl Gold Project in Kazakhstan.
Ivanhoe Mines’ shares are listed on the New York, NASDAQ and Toronto stock exchanges under the symbol IVN.
Information contacts
Investors: Bill Trenaman +1.604.688.5755 / Media: Bob Williamson +1.604.331.9830
Website: www.ivanhoemines.com

 

 


 

Forward Looking Statements:
Certain statements made herein, including statements relating to matters that are not historical facts and statements of our beliefs, intentions and expectations about developments, results and events which will or may occur in the future, constitute “forward-looking information” within the meaning of applicable Canadian securities legislation and “forward-looking statements” within the meaning of the “safe harbor” provisions of the United States Private Securities Litigation Reform Act of 1995. Forward-looking information and statements are typically identified by words such as “anticipate,” “could,” “should,” “expect,” “seek,” “may,” “intend,” “likely,” “plan,” “estimate,” “will”, “believe” and similar expressions suggesting future outcomes or statements regarding an outlook. These include, but are not limited to, statements respecting Altynalmas Gold’s planned exploration and development work; the planned development work at the Bakyrchik mine; the completion of the planned prefeasibility study; the ability to consistently achieve recovery rates between 86% and 90%, and the likely significant increase in the project’s indicated resource in the near future.
All such forward-looking information and statements are based on certain assumptions and analyses made by Ivanhoe Mines’ management in light of their experience and perception of historical trends, current conditions and expected future developments, as well as other factors management believes are appropriate in the circumstances. These statements, however, are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information or statements. Important factors that could cause actual results to differ from these forward-looking statements include those described under the heading “Risks and Uncertainties” elsewhere in the Company’s MD&A. The reader is cautioned not to place undue reliance on forward-looking information or statements.

 

 


 

(MAP)
(MAP)

 

 


 

(MAP)

 

 


 

(MAP)

 

 


 

SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
         
  IVANHOE MINES LTD.
 
 
Date: June 7, 2010  By:   /s/ Beverly A. Bartlett    
    BEVERLY A. BARTLETT   
    Vice President & Corporate Secretary